Correct installation of the water meter in a chain with a tap from the leak of "Neptune"
Hello! I installed the water meters in the sequence: ball valve - tap for leaking "Neptune" - oblique filter - water meter. The customer brought another plumber, and he said that Neptune should not be placed in front of the water meter and assembled everything differently (see photo). And how is it really so? Thank.
Attached Images:
Visitors Comments
Add a comment
Hello. In fact, you can install Neptune cranes and other manufacturers with an electric drive in any order. It does not matter where such a crane will be located: in front of the water meter or behind it. Here are some live photos where cranes with an electric drive are installed, both in front of water meters and after.
Here the point is that the masters were called, he arrived, but it is not profitable for him to say that everything is in order. He quickly thinks up that an electrically driven crane needs to be installed after the water meter, corrects a “serious mistake” and gets paid. Here is how I see this situation, I attach the promised photo examples.